본문 바로가기주메뉴 바로가기하단 바로가기
sidemenu open/close

LEE, CHAE YONG 이미지뷰어 새창

  • ISSUE NO. 13 NO. 1833 1950-09-29
    대위 중등교육 남성
ATIS INTERROGATION REPORT NO. 1833 12 October 1950
FIELD REPORT (164 - MISDI - 1079) 5 October 1950

PW NAME: LEE, CHAE YONG (李在永) (리재영)
RANK: Sr Lieutenant (中尉)
ORGANIZATION: Home Ministry, Rear Bridge Reconstruction Regt, 10th Bn.
EDUCATION: OSAKA KANSAI ENGINEER SCHOOL (4 years)
AGE: 32
OCCUPATION: Civ Engineer
ADDRESS: KANGWONDO, WONSAN SHI, SONGHUNG NI, #31 (江原道 元山市 松興里 三一番地)
DATE & PLACE OF CAPTURE: 290900 K Sep 50 at mountain 28 km NE of CHONGJU by 11th Regt ROK.
INTERROGATOR: CHS


ASSESSMENT:
PW was cooperative, but military information was limited, because he worked with volunteer group.

T/O & E AND STRENGTH:
Rear Bridge Reconstruction Regt composed of three Battalions and two Independent Bridge construction companies.
Battalions composed of three Companies.
Company composed of 4 or 5 platoons.
Personnel for the Battalions were usually taken from men in the occupied areas, Technicians usually became officers. Battalion C.O. and Staff officers were North Koreans.
10th BattalionOriginal
A. Personnel:
  1. EM800
  2. Officers50
  3. Total850
B. Equipment & Ammo:
  No weapons.
Personnels brought their own carpenter tools. Other materials, such as nails, hammers, saws, bulldozers, were promised to construction units by the Home Ministry but they never arrived.
There was one petroleum operated 70 cm round saw in his Battalion.

LOCATION & ACTIVITIES OF UNITS (Aa of 26 Sep 50)
PW stated that the Regt C.O. was at PYONGYANG Home Ministry Building and the Assistant Regt C.O. was at SEOUL. 10th Battalion Headquarter was located at TAEJON.

PERSONAL & UNIT HISTORY:
From 15 Feb 50, PW worked for the Civ Utility Dept under the Home Ministry as a utility inspector. On 10 Jul 50, the utility Dept (SHISETSU SHO) was reorganized into the Rear Bridge Reconstruction Regt. On the same day, PW was commissioned Captain.

PERSONALITIES:
NAMERANKDUTYORGN
CHANG, HOE RIN (장회린)Lt Col (中佐)C.O.10th Bn
LEE, NAK YUNG (리낙영)Major (少佐)S/O10th Bn
IM, DUK SU (임덕수)Sr Lt (中尉)Inspector10th Bn
PAK, SHIN KYU (박신규)Sr Lt ( 〃 )Inspector10th Bn
KIM, NAK WON (김낙원)Sr Lt ( 〃 )Supervisor10th Bn
SONG, CHUN WON (송준원)Sr Lt ( 〃 )Supervisor10th Bn
KIM, HYONG CHOL (김병철)Sr Lt ( 〃 )Supervisor10th Bn
CHANG, SO DOK (장수덕)Capt (大尉)Chief Supervisor10th Bn
LEE, YUN SIK (리윤식)Sr Col (總佐)C.O.Regt
KON, NYON GHA (권명하)Colonel (大佐)Ass’t C.O.Regt
CHO, KWAN HA (조관하)Colonel ( 〃 )Staff OfficerRegt


WOODEN BRIDGE CONSTRUCTION:
The volunteer group at KONGJU were legging to construct a wooden bridge, 240 meters long x 6 meters wide and 1 meter high above the water level. This proposed bridge was supposed to be constructed at a point 2 km East of KONGJU across the KINKO River. Work abandoned after one week. There was no other bridge construction in South Korea for this unit.
Wooden bridges were being constructed to replace demolished bridges. Average capacity, about 12 - 13 tons.
Fords were also constructed as alternate crossings.